Kamis, 16 Agustus 2012

Photo Project

  • Project Instalasi OHC ( Over Head Crane ) at PT ARTAS PETROGAS 
         " Wiring & Instalation Electical Cable Control & Power Crane "




  • Project Control ATS " Automatic Transfer Switch " at PT ASDP Persero
    " Automation Control Generator for Back Up Power Supply "

       

     
  • Project Progammable PLC S7 400 at PLTU Labuan 

  • Project Pemasangan Stabilizer 12KVA dan Trafo 10KVA untuk Machine Seal Maker di   PT Tuffiadi Semesta
       



       
       

Tidak ada komentar:

Posting Komentar